Future-path worksheet

Expand this display, or replace the weak link?

Another box of lights is not an expansion plan when replacements vanished, generations do not mix, the controller is full, or a quarter of the old segments are already failing.

Display result

Expand only if the old system has a future

Check current expansion stock, replacement parts, controller room, and generation support.

    Count the working system

    Test and label every current segment before buying more. Compatibility research is much easier when you know the exact generation, controller, failures, and capacity you already own.

    Current primary guidance: CPSC seasonal-lighting safety characteristics and UL indoor/outdoor marking guidance.

    Duck's call

    What to do next

    Compare compatibility, replacement availability, failure points, storage, and future expansion.

    Leave this page with

    A clear expand, replace, or research-before-buying answer.